RUNH Power, a professional power plant equipment supplier and EPC contractor, dedicates in construction and service of the global power industry.
The steam turbine generator and its auxiliary system are arranged in the steam engine room, through the main steam, water supply system, reheating system and boiler steam water system to achieve organic connection, and they are also relatively independent.
The performance and reliability of the turbo-generator set and its auxiliary system directly affect the whole performance and reliability of the power station. At the same time, the construction of the turbine room, the installation schedule of the turbine generator set and its auxiliary system equipment, pipelines, has a huge impact on the duration of the whole project. Therefore, improveingthe reliability and efficiency of the main engine and the thermal system in the engine room; Optimizing plant layout and civil construction structure is of great significance for the construction and later operation of the power plant.
○ Turbine generator set and its auxiliary equipment ○vacuuming system ○main steam system | ○Deaerating, feed water system ○ Regenerative System |
The steam exhaust is located on the upper cylinder. The upward exhaust steam turbine adopts ground mounted arrangement, which is applicable for small capacity steam turbine. | Ground mounted arrangement needs only to excavate and pour the foundation; The advantage of ground mounted arrangement (applied for a unit 1 mw - 9 mw) ●Turbine uses common base frame, skid mounted which shorten the installation duration ●Lower the main building height, without high operation level which saves quantity of civil works ●Easy and convenient operation 60%-80% cost saving on investment of civil work of foundation |
The steam exhaust is located on lower casing of the turbine. The double-layer arrangement is applicable for all capacity machines. It needs to deal with the foundation and turbine table. Advantages of double-layer arrangement: ○Abundant space for equipment and piping layout and plant layout is relatively neat; ○Close distance between turbine hall and control room makes a convenient operation for operators; |
Efficient 3d design Optimization of building layout
Civil work quantity reduction;shorten the construction period save investment
Long maintenance interval
Integration of turbine island equipments;Integration of turbine island equipments
High automation level of configured equipments; Fewer operators
Perfect technical service team to provide spare parts, overhaul and other services
● Optimized plant layout, high efficient 3D design
Using advanced 3D design software. Optimize turbine island processes and architectural design.
● Turbine Island equipments integration
Selecting high efficient turbine generator set and auxiliary equipments to greatly improve the efficiency of the unit and reduce the heat rate and steam rate.
● Civil work quantity reducing, construction duration shortening and investment saving
(1)Greatly save the concrete, rebar and structure steel consumption
(2)Save construction tools and equipments, shorten the construction period about 2 months
(3)With skid-mounted turbine generator set, the installation duration of the equipment is reduced by more than 50%.
● Comparative analysis of initial investment and economic benefit of 30MW high temperature and high pressure condensing unit
Using advanced 3D design software, optimized turbine island and optimized architectural design.
conventional unit
○ Unit cycle efficiency ~ 36%;
○ Initial equipment price ~ 20 million;
○ downward exhaust steam construction cost more than ~ 3 million;
○ Overhaul cycle ≤4 years
High efficiency unit
○ Unit cycle efficiency ~ 39.2%
○ Initial equipment price ~ 30 million;
○ Axial exhaust steam site construction cost saving ~ 3 million
○ Overhaul cycle ≥8 years.
economic and efficiency analysis
At the same steam flow rate, the high efficiency unit can obtain additional revenue per year:(39.2%-36%)×75000kw×8760h/year×0.5元/kwh=10.512million yuan;
Multiple input part of high-efficiency units payback period [(30million—3moillion)-200million]/10.512million yuan≈8 months;
The high efficiency steam engine has low construction cost, long overhaul period, and saves later operation cost.
● Perfect technical service team, timelyspare parts supplying, overhaul and other services Runh has an independent after-sales service team, which can provide timely and comprehensive protection for customers. 24-hour timely response; Turbine transformation, including efficiency improvement, capacity increase, heat supply transformation, high back pressure transformation, etc; overhaul; Spare parts service. |