The gas-steam combined cycle is mainly composed of gas turbine (GT), waste heat recovery boiler (HRSG), steam turbine (ST) and its auxiliary facilities.
The gas turbine generator set, the waste heat boiler and the steam turbine generator set form a combined cycle system. The high-temperature flue gas generated by the gas combustion in the gas turbine combustion chamber drives the turbine blades to work and then enters the HRSG. The heat recovered by the HRSG heats the water into steam with different parameters. The steam enters the steam turbine to work. The gas turbine and the steam turbine drive the generator(s) to generate power.
● An effective, affordable, reliable solution which contributes to world’s decarbonization demand.
● A combined cycle efficiency up to 64%.
● Low environment pollution: NOx< 25ppm, no need of desulfurization and dust ellimination.
● Low unit cost investment comparing to other sorts of power generation complex.
● Can alternate flexibly between base-load operation and peak-load operation.
● Less land occupation and less water consumption.
● Gas turbine - Selecting products of the world-famous manufacturers who represent the advanced industrial gas turbine manufacturing level, such as GE, Siemens and Mitsubishi, etc. as per client needs and project specification.
Main technical parameters of 400-600MW gas turbine | |||||
GE 9HA.01 | GE 9HA.02 | SIEMENS SGT5-8000H | Mitsubishi M701J | Mitsubishi M701JAC (2018) | |
SC Net Heat Rate (kJ/kWh, LHV) | 8398 | 8166 | 8740 | 8511 | 8182 |
SC Net Output (MW) | 448 | 571 | 450 | 478 | 448 |
Compressor pressure ratio | 22.8 | 23.8 | 21.0 | / | / |
SC Net Efficiency (%, LHV) | 42.9 | 44.0 | 41.2 | 42.3 | 44.0 |
Exhaust flow under ISO condition,kg/s | 847.8 | 1039.9 | 935 | 896 | 765 |
flue gas temperature,℃ | 648 | 640 | 630 | 630 | 663 |
Direction of exhaust | axial exhaust | axial exhaust | axial exhaust | axial exhaust | axial exhaust |
Main technical parameters of 300MW gas turbine | |||||
GE 9F.06 | GE 9F.05 | GE 9F.04 | SIEMENS SGT5-4000F | Mitsubishi M701F | |
SC Net Heat Rate (kJ/kWh, LHV) | 8768 | 9333 | 9295 | 8780 | 8592 |
SC Net Output (MW) | 342 | 314 | 288 | 329 | 385 |
Compressor pressure ratio | / | 18.3 | 16.9 | 20.1 | 18 |
SC Net Efficiency (%, LHV) | 41.1 | 38.6 | 38.7 | 41 | 41.9 |
Exhaust flow under ISO condition,kg/s | / | 713.4 | 661.8 | 724 | 748 |
flue gas temperature,℃ | 618 | 632 | 621 | 599 | 630 |
Direction of exhaust | axial exhaust | axial exhaust | axial exhaust | axial exhaust | axial exhaust |
Main technical parameters of 120-200MW gas turbine | |||||
GE 9F.04 | GE GT13E2-190 | GE GT13E2-210 | SIEMENS SGT5-2000E | Mitsubishi M701DA | |
SC Net Heat Rate (kJ/kWh, LHV) | 9747 | 9361 | 9474 | 9863 | 10350 |
SC Net Output (MW) | 126.75 | 195 | 210 | 166.7 | 144.09 |
Compressor pressure ratio | 13.2 | 17.6 | 18.2 | 12.8 | 14 |
SC Net Efficiency (%, LHV) | 36.9 | 38.5 | 38.0 | 36.5 | 34.8 |
Exhaust flow under ISO condition,kg/s | 419.6 | 556.3 | 621.6 | 558 | 453 |
flue gas temperature,℃ | 547 | 513 | 515 | 536 | 542 |
Direction of exhaust | lateral exhaus | axial exhaust | axial exhaust | axial exhaust | axial exhaust |
Main technical parameters of 40-90MW gas turbine | |||||
GE 6B.03 | GE 6F.01 | GE 6F.03 | SIEMENS SGT-800 | Mitsubishi H-25 | |
SC Net Heat Rate (kJ/kWh, LHV) | 10779 | 9469 | 9788 | 8759(gross) | 9949 |
SC Net Output (MW) | 45 | 57 | 88 | 62.5(gross) | 41 |
Compressor pressure ratio | 12.8 | 22.3 | 16.4 | 21.1 | / |
SC Net Efficiency (%, LHV) | 33.4 | 38.0 | 36.8 | 41.1 | 36.2 |
Exhaust flow under ISO condition,kg/s | 145.1 | 134.2 | 218.8 | 135.5 | 114 |
flue gas temperature,℃ | 561 | 613 | 622 | 596 | 569 |
Direction of exhaust | axial exhaust | axial exhaust | axial exhaust | axial exhaust | axial exhaust |
● HRSG – RUNH Power selects verious products of the world-famous manufacturers who represent the advanced HRSG manufacturing level, such as GE, Siemens, Thermax, Hangzhou Boiler, etc. as per client needs and project specification.
● Steam Turbine – RUNH Power selects various products of the world-famous manufacturers who represent the advanced steam turbine manufacturing level, such as GE, Siemens, Mitsubishi, DTC, STC, HTC, etc. as per client needs and project specification.
RUNH Power provides the client with turnkey services covering project initiation, engineering, equipment procurement, construction and commissioning.
Technology, experience, and people—this combination is what allows RUNH to aim to deliver the highest value simple cycle and combined cycle power plants anywhere in the world.
Our people work every day to create and aim to deliver ground breaking solutions for customers, partners, and communities around the world.
Deliver improved plant economics, including:
○ Reduced capital costs
○ Reduced operation and maintenance costs
○ Shorter installation times, reduced installation costs, and fast revenue production
○ Improved reliability and availability
▶ Project Engineering: Our engineering offers tailored various layouts of gas-steam combined cycle power plant as per project specialty
1x1 configuration: 1 gas turbine + 1 HRSG + 1 steam turbine
1x1 single shaft configuration: 1 gas turbine and 1 steam turbine align in a single shaft line and drive one common generator;
1x1 multi shafts configuration: 1 gas turbine and 1 steam turbine align in two shaft lines and drive 2 generators respectively;
2x1 configuration: 2 gas turbines + 2 HRSGs + 1 steam turbine. 2 gas turbines and 1 steam turbine drive 3 generators respectively.
Nx1 configuration: N (N>2) gas turbines + N(N>2) HRSGs + 1 steam turbine. All gas turbines and steam turbine drive generators respectively.
▶ Project Procurement: RUNH Power provides client satisfied products with professional service executed by a team covering vendor qualification/management, procurement, manufacture supervision and transportation & logistic.
▷ With over 20 years of development, RUNH Power has established a complete supply chain system. The continuously maintained vendor database ensures that there are no less than 5 qualified suppliers for each category of materials
▷ A complete procurement system provides proper management of procurement bidding, contract negotiation and contract execution.
▷ With a experienced manufacturing supervision team, RUNH Power tracks the whole process from the design and manufacturing of equipment to the packaging and transportation of equipment which ensures the full qualified equipment delivered to our clients.
RUNH Power partners - internationally renowned enterprises
▶ Project Construction:
▷ A professional team with more than 20 years of experience in power station project construction
From the technical negotiation stage of the project to a series of professional services such as preparation for commencement, preparation of construction period, equipment supervision, construction, on-site safety management, quality management, cost accounting and control, system commissioning, etc.
▷ A complete HSE construction management system
Adhere to the management principle of "prevention first and people-oriented", strictly guarantee the health and safety of personnel, ensure that the project construction conforms to the laws and regulations on environmental protection, eliminate major safety accidents, and provide the owner with high-quality and safe power station projects.
● Spare parts
RUNH established a close relationship and cooperation with well-known power generation equipment enterprises at home and abroad (GE, Siemens, HEC, DEC, SEC, etc.). Under the guarantee of strict and sound supplier management system, mature end customer service and return visit system, we serve customers all over the world high-quality spare parts under various technologies at a reasonable price.
● Overhauling
With rich experience in turbine and generator maintenance and overhaul, professional vocational training and project management, we are competitive on solving problems and defects of products involved.