PROJECTS > Overseas Projects > CENTURY PAPER 18MW COAL-FIRED POWER PLANT PROJECT, PAKISTAN (May. 19, 2014)

CENTURY PAPER 18MW COAL-FIRED POWER PLANT PROJECT, PAKISTAN (May. 19, 2014)

Working Scope:
Design and engineering; Supplying complete set of equipment; Civil works and installation.
On the basis of the first and second phase O&M contracts, on August 31, 2017, Source and Power Station Co., Ltd. signed the third phase O&M contract with CENTURY PAPER & BOARD MILLS LIMITED, Pakistan.
boiler
Type
CFB
Rate devaporation
65t/h
Rateds teampressure
5.29MPa
Ratedsteam temperature
485℃
The feed water temperature
150℃
The thermal efficiency of the boiler90%
Qty. 2sets
Steam Turbine
Model
C18-4.9/1.1
Rated power
18MW
Rotation rate
6200r/min
Gear box efficiency
98.50%
Rated inlet pressure/temp4.9MPa(a)/475℃
Rated extraction steam parameters
1.1MPa(a)/286℃/45t/h
Qty1set
Generator
Model
QFW20-2
Rated Power
20MW
Rated Voltage
11kV
Power factor
0.8
Rotated Speed1500r/min
Qty.1set